Load Cell Installation Need To Pay Attention To A Few Points

- Oct 24, 2017 -

Cement mixing station needs to be divided into four parts: gravel to the silo, powder (cement, fly ash, expansion agent, etc.) to the silo, water and admixture to the silo, transmission mixing and storage.

When the mixer control system is powered on, it enters the operation control interface of the man-machine dialogue system. The system will initialize itself, including the formula number, the concrete grade, the slump, the production volume and so on. According to the weighing of the silo, measuring bucket for testing, the output material empty or full signal, prompting the operator to determine whether to start the mixing control program.

Cement mixing station needs to be divided into four parts: gravel to the silo, powder (cement, fly ash, expansion agent, etc.) to the silo, water and admixture to the silo, transmission mixing and storage.

When the mixer control system is powered on, it enters the operation control interface of the man-machine dialogue system. The system will initialize itself, including the formula number, the concrete grade, the slump, the production volume and so on. According to the weighing of the silo, measuring bucket for testing, the output material empty or full signal, prompting the operator to determine whether to start the mixing control program.

When the concrete is produced by the mixing station, the stone, the sand and the cement are sent to the stone metering bucket, the sand metering bucket and the cement metering bucket respectively, and the weighing is measured. When the metering is reached, the feeding is stopped and the valve is opened , The stone, sand and cement transported to the summary bucket, the delivery of closed metering valve. Aggregate the aggregate in the forehead and deliver it to the mixing station.

Slag, lime and expansion agent, etc., according to a given proportion of the formula sent to the measurement bucket specified in the measurement, and then through the metering bucket to the powder unloaded into the mixer. Water and admixture, according to the proportion of a given formula to the specified measurement of measurement, to set the measurement is sent to the mixer. The whole process, the mixer has been in a state of mixing until all the materials into the mixer, start timing, to reach the formula set the mixing time, open the mixer discharge valve, release finished concrete.

In the whole measurement is called, the load cell plays an irreplaceable role. The metering bucket converts the mass signal into a measurable electrical signal through a load cell and transmits the man-machine in the specified control panel for operational control.

Mixing station load cell installation need to pay attention to several points:

First, the packaging of heavy sensors; with waterproof and dustproof material closed heavy sensor, keep the sensor components are not affected.

Second, control the environment or create a suitable for heavy sensor work environment.

Third, welding sealing.

Mixing station sensor environment is relatively the most harsh, so pay attention to moisture-proof design, in order to reduce the environment damage to the sensor, to extend its life!

The appearance of the load cell load cell with the emergence of cement, the development of the beginning of the form of a single machine, now there are many different types. I believe that the development prospects of the mixing station is bright.